The latest development of xiongan underground section of Xiongxin High-speed Railway

2022-07-17 0 By

Notice of competition for river Protection and Restoration Design of underground Section Civil Engineering Project of Xiongan New Area of Xiongxin High-speed Railway The procurement conditions for river protection and restoration design of underground section Civil engineering project of Xiongan New Area of Xiongxin High-speed Railway have been met and suppliers are now invited to participate in the competition and procurement activity.1.1 Procurement Project Name: Xiongxin High-speed Railway Xiongan New Area Underground Civil Engineering Project River protection and restoration design 1.2 Purchaser: Xiongan Xiongshang Development Co., LTD. 1.3 Procurement Agent: China Investment Consulting Co., LTD. 1.4 Procurement project Fund source: government investment.1.5 Procurement fund implementation: It has been implemented.1.6 Procurement Project Overview: The section from Xiongan New Area to Baoding of Xiongxin High-speed Railway starts from Xiongan Inter-city Railway Station in the east and ends at Baoding East Railway Station in the west, with a total length of about 34.2km in the New Area.The underground section of Xiongan New Area of Xiongxin Railway enters underground from the east side of Baigou River, passes through the starting area and is laid along the east-west axis of central Green Valley. Xiongan West (intercity) station is set up in the starting area, xiaoli station is reserved in the west group, and then goes through the Ping River and out of the starting area. The length of the underground section is about 19.9km and is constructed according to the 250km/h standard.The railway goes through ping River and Baigou River by open excavation.According to the plan, the railway line is located below the green axis along a straight line.1.7 Number of completed suppliers: 1.2.1 Scope of purchase: Civil engineering of underground section of Xiongan New Area of Xiongxin High-speed Railway, down-crossing Baigou River diversion, river restoration and protection design of Ping River.2.2 Term of service: from contract signing to completion acceptance of the project.2.3 Service Location: Xiongan New Area, Hebei Province.2.4 Quality standard: Qualified.The preparation service of special Report of energy conservation Evaluation for underground Section supporting Projects of Xiongan New Area of Xiongxin High-speed Railway has met the procurement requirements, and now the procurement activity of public competition is conducted.Procurement project Introduction 1.1 Procurement Project Name: Preparation of special report of Energy conservation Assessment for underground Supporting projects of Xiongan New Area of Xiongxin High-speed Railway 1.2 Purchaser: Xiongan Xiongshang Development Co., LTD. 1.3 Fund Implementation of procurement project: Government investment + Enterprise self-financing, which has been implemented 1.4 Project Overview:The underground section of Xiongan New Area of Xiongxin High-speed Railway covers an area of 366.6496 hectares with a total length of 24.32 kilometers, starting from the Ping River in the west and reaching the Baigou River in the east. The starting area is 22 kilometers long, and the width of the axis is generally 125 meters (not including the width of the building back line on both sides).Parts are expanded with the planned layout.The construction includes roads, Bridges, tunnels, comprehensive pipe corridors, underground space, underground pedestrian crossings, reserved frames and cover boards, water supply, drainage, gas, heat, landscaping, river systems, etc., with an investment of 16.4 billion yuan.1.5 Number of suppliers: 1.2. Purchase Contents and Related RequirementsComplete male Xin Gao Tiexiong Ann district underground engineering project related (excluding male Ann intercity station, small station, station hub supporting project financial island) in the energy conservation evaluation report preparation (including assessment report compilation, review, hire experts, the examination and approval), and obtain the approval of the competent department documents, cooperate with project follow-up inspection and acceptance of the service work, etc.2.2 Term of service: from the date of signing this Contract to the date of obtaining the approval of the energy saving assessment report of the project from relevant competent authorities and completing the follow-up services.2.3 Service Location: Xiongan New Area, Hebei Province.2.4 Quality standard: Qualified.The preparation service of risk Assessment Report of engineering geological disaster related to underground section of Xiongan New Area of Xiongxin High-speed Railway has been qualified for procurement, and suppliers are now invited to participate in the procurement activity.1.1 Procurement Project Name: Preparation service of geological disaster risk assessment report for underground Section of Xiongan New Area of Xiongxin High-speed Railway Supporting Engineering 1.2 Purchaser: Xiongan Xiongbusiness Development Co., LTD. 1.3 Procurement Agency: /1.4 Fund Implementation of procurement project:Government investment + enterprise self-financing, 1.5 Procurement project overview:The underground section of Xiongan New Area of Xiongxin High-speed Railway covers the area of the central green belt and the red line on both sides of the road, from the west side of the Ping River in the west to the east side of the Baigou River in the east, with a length of 24.32km (including the extension sections at both ends of the north road and the U-shaped grooches at both ends of the railway tunnel). The starting area is about 22 km long, covering an area of about 366.6496 hectares.The width of the axis is generally 125 meters (not including the width of both sides of the building setback line), which is partially widened with the planning layout.The construction content includes roads, Bridges, tunnels, comprehensive pipe corridors, underground space, underground pedestrian crossings, reserved frames and cover boards, water supply, drainage, gas, heat, green landscape, river system and so on.1.6 Number of completed suppliers: 1.